N9K-C93180YC-EX Specification |
|
Ports | 48 x 10/25-Gbps and 6 x 40/100-Gbps QSFP28 ports |
Downlink supported speeds | 1/10/25-Gbps speeds |
CPU | 4 cores |
System memory | 24 GB |
SSD drive | 64 GB |
System buffer | 40 MB |
Management ports | 2 ports: 1 RJ-45 and 1 SFP |
USB ports | 1 |
RS-232 serial ports | 1 |
Power supplies (up to 2) | 650W AC, 930W DC, or 1200W HVAC/HVDC |
Typical power (AC/DC) | 210W |
Maximum power (AC/DC) | 470W |
Input voltage (AC) | 100 to 240V |
Input voltage (high-voltage AC [HVAC]) |
200 to 277V |
Input voltage (DC) | –48 to –60V |
Input voltage (high-voltage DC [HVDC]) |
–240 to –380V |
Frequency (AC) | 50 to 60 Hz |
Fans | 4 |
Airflow | Port-side intake and exhaust |
Physical dimensions (H x W x D) |
1.72 x 17.3 x 22.5 in. (4.4 x 43.9 x 57.1 cm) |
Acoustics | 48.5 dBA at 40% fan speed, 64.9 dBA at 70% fan speed, and 77.8 dBA at 100% fan speed |
RoHS compliance | Yes |
MTBF | 390,330 hours |
Maximum number of Longest Prefix Match (LPM) routes | 896,000 |
Maximum number of IP host entries | 896,000 |
Maximum number of MAC address entries | 256,000 |
Maximum number of multicast routes | 32,000 |
Number of Interior Gateway Management Protocol (IGMP) snooping groups | Shipping: 8,000
Maximum: 32,000 |
Maximum number of Cisco Nexus 2000 Series Fabric Extenders per switch | 16 |
Maximum number of Access Control List (ACL) entries | Per slice of the forwarding engine:
4000 ingress 2000 egress Total (2 forwarding slices): 8000 ingress 4000 egress |
Maximum number of VLANs | 3,967 |
Number of Virtual Routing and Forwarding (VRF) instances | Shipping: 1,000
Maximum: 16,000 |
Maximum number of ECMP paths | 64 |
Maximum number of port channels | 512 |
Maximum number of links in a port channel | 32 |
Number of active SPAN sessions | 4 |
Maximum number of VLAN’s in Rapid per-VLAN Spanning Tree (RPVST) instances | 3,967 |
Maximum number of Hot-Standby Router Protocol (HSRP) groups | 490 |
Number of Network Address Translation (NAT) entries | 1,023 |
Maximum number of Multiple Spanning Tree (MST) instances | 64 |
Flow-table size used for Cisco Tetration Analytics platform | 64,000 |
Operating temperature | 32 to 104°F (0 to 40°C) |
Nonoperating (storage) temperature | –40 to 158°F (–40 to 70°C) |
Humidity | 5 to 95% (noncondensing) |
Altitude | 0 to 13,123 ft (0 to 4000m) |
Weight (without power supplies or fans) | 17.2 lb (7.8 kg) |
Means of Payment
For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and wire transfer.
RFQ (Request for Quotations)
It is recommended to request for quotations to get the latest prices and inventories about the part.
Our sales will reply to your request by email within 24 hours.
IMPORTANT NOTICE
1. You’ll receive an order information email in your inbox. (Please remember to check the spam folder if you didn’t hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping Method
Currently, our products are shipped through DHL, FedEx, SF, and UPS.
Delivery Time
Once the goods are shipped, estimated delivery time depends on the shipping methods you chose:
FedEx International, 5-7 business days.
The following are some common countries’ logistic time.