WS-X45-SUP7-E Specification |
|
Chassis compatibility | All Catalyst 4500 E-series switches |
Software requirements (minimum) | Refer to your software release notes for the latest software release requirements |
Chassis slot restrictions | •Catalyst 4503-E: Slot 1 only
•Catalyst 4506-E: Slot 1 only •Catalyst 4507R-E and Catalyst 4507R+E: Slot 3 and slot 4 •Catalyst 4510R-E and Catalyst 4510R+E: Slot 5 and slot 6 |
Bandwidth per slot | 48-Gbps |
Memory | 2-GB (upgrade to 4-GB) |
STATUS LED | The status LED indicates the current health of the supervisor engine and the current software state. |
RESET switch | The RESET switch is used to reset and restart the switch.
Note Use a paper clip or other small, pointed object to press the RESET switch. |
ACTIVE SUP LED | The active supervisor engine LED indicates whether the supervisor engine is active or in standby mode in redundant supervisor engine configurations. |
UTILIZATION LEDs | Eight LEDs indicate (as an approximate percentage) the current traffic load over the backplane. |
USB connectors | Two USB 2.0 ports are provided. Port 1 operates in device mode (upstream) and port 2 in host mode (downstream). Port 1 has a standard Type B USB connector and can be used as a USB console.Port 2 has a USB type A connector and a standard USB 2.0 device like a flash memory device can plug into this connector. |
SECURE DIGITAL slot | A standard Secure Data (SD) memory card interface is provided on the front panel |
CONSOLE port | This is a 10/100/1000 port that uses an RJ-45 connector. The console port allows you th access the switch either locally (with a console terminal) has an RJ-45 connector. The console port allows you to perform the following functions:
•Configure the switch from the CLI •Monitor network statistics and errors •Configure SNMP agent parameters |
10/100/1000 MGT port | The Ethernet management port is a Layer 3 host port to which you can connect a PC. You can use the Ethernet management port instead of the switch console port for network management. When managing a switch, connect the PC to the Ethernet management port on a Catalyst 4500 E-series switch.
Note When connecting a PC to the Ethernet management port, you must assign an IP address. |
LINK LED | The 10/100/1000 MGT port has a link LED associated with it. |
1G/10G UPLINKS (SFP/SFP+) ports | The Supervisor Engine 7-E has four 1-G or 10-G ports that use either SFP transceivers or SFP+ transceivers. |
Uplink port LEDs | Each of the four uplink ports has two LEDs associated with it. One LED displays port status when a 1-GB SFP transceiver is installed in the port socket. The second LED displays uplink port status when a 10-GB SFP+ transceiver is installed in the port socket. |
Power requirement | 302 W |
Operating temperature | Certified for operation: 32° to 104°F (0° to 40°C)
•Designed and tested for operation: 32° to 130°F (0° to 55°C) |
Humidity (RH) ambient (noncondensing) | 10 to 90% |
Operating altitude | Certified for operation: 0 to 6500 ft (0 to 2000 m)
•Designed and tested for operation: -200 to 10,000 ft (-60 to 3000 m) |
Operating temperature | Certified for operation: 32° to 104°F (0° to 40°C)
•Designed and tested for operation: 32° to 130°F (0° to 55°C) |
Means of Payment
For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and wire transfer.
RFQ (Request for Quotations)
It is recommended to request for quotations to get the latest prices and inventories about the part.
Our sales will reply to your request by email within 24 hours.
IMPORTANT NOTICE
1. You’ll receive an order information email in your inbox. (Please remember to check the spam folder if you didn’t hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping Method
Currently, our products are shipped through DHL, FedEx, SF, and UPS.
Delivery Time
Once the goods are shipped, estimated delivery time depends on the shipping methods you chose:
FedEx International, 5-7 business days.
The following are some common countries’ logistic time.